Olympia, WA

Temporary Power Pole in Olympia, WA

Olympia Porta Pros arranges the temporary power pole setup that gets your construction site inspected and energized, typically a 200 amp service mounted on a treated pole with a meter base and panel. Most jobs need the pole scheduled 1 to 2 weeks ahead so the utility and inspector can both sign off before crews show up.

  • Serving the metro year round
  • Weekly servicing included

What Is a Temporary Power Pole?

A temporary power pole, sometimes called a temp pole or construction power pole, is a freestanding pole rigged with a meter socket, breaker panel and outlets that gives a job site power before permanent electrical service exists. Crews run tools, lighting and trailers off it. If you are already staging a mobile office trailer rental or a storage container rental on site, the pole usually lands near that cluster so cords stay short. Picture it next to the same laydown area as your temporary fence rental and light tower rental, since all three tend to share one corner of the site. A temporary power pole diagram from your electrician should show pole height, grounding rod placement and clearance from the roadway before anyone digs.

How Much Does Temporary Power Pole Installation Cost in Olympia?

Cost depends on amperage, trenching distance and how far the pole sits from the utility drop. A 200 amp temporary power pole for a construction site is the most common configuration we see requested locally in Olympia. Because pricing runs through your electrical contractor rather than Olympia Porta Pros directly, we do not quote pole installation costs here, but we coordinate delivery timing around it once your contractor gives us a date. If your project also needs construction site services bundled together, ask about scheduling the pole alongside your portable toilet rental delivery so both land the same week.

On the job with our local crew

What Are the Requirements for a Temporary Power Pole?

Requirements vary by jurisdiction and by the serving utility, and Olympia's specific placement and permitting rules for temporary power poles were not verified for this page, so confirm them directly with the city before you install. What we can say: OSHA 1926.404(b)(1)(ii) requires ground fault circuit interrupter protection on construction sites, and that applies to the outlets your temp pole feeds. Keep the pole area lit per OSHA 1926.56(a) minimum illumination guidance for construction areas, especially if crews access it before sunrise. Housekeeping around the pole matters too. OSHA 1926.25 requires scrap and debris cleared from work areas, and a power pole surrounded by cable spools and packaging is a tripping hazard waiting to get cited. If your site sits near Tumwater, 4.6 miles south of Olympia, or Tanglewilde, 5.9 miles east, the same GFCI and clearance expectations travel with the job since they are OSHA-driven, not city-specific.

Once power is live, most sites still need sanitation staged nearby. A single standard porta potty rental at a job trailer cluster satisfies OSHA 1926.51(c) for crews of 20 or fewer, and that unit typically sits within reach of the same trailer pad as the power pole. Larger crews should check how many porta potties do I need before ordering, since the ratio changes at 20 workers and again at 200.

On the job with our local crew

Frequently Asked Questions

How long does temporary power pole installation take?

Installation itself is usually a half day to a full day once materials are on site, but scheduling the utility connection and inspection can add a week or more. Book your pole before you book anything else time-sensitive, including your emergency porta potty rental or temporary fence rental, since power delays cascade into everything downstream.

Does Olympia Porta Pros install temporary power poles?

No. We handle portable sanitation, roll-off dumpster rental, storage container rental and temporary fence rental. For the pole itself, work with a licensed electrical contractor. We coordinate our delivery schedule around your pole timeline so nothing blocks site access.

Can a temporary power pole run tools and a restroom trailer together?

Yes, on most sites. A 200 amp pole generally covers job trailers, tools and a hookup for a restroom trailer rental, but confirm total load with your electrician before finalizing the panel size.

What amperage does a construction site usually need?

Many mid-size sites in Olympia run 200 amp temporary service, though smaller renovation jobs sometimes need less. Your electrician sizes this against total equipment draw, not against site square footage alone.

Where does the power pole go relative to other site equipment?

Most contractors place it near the trailer cluster, close to the mobile office trailer rental and dumpster pad, so cords stay short and clear of vehicle paths and the dumpster permit requirements setback if one applies.

On the job with our local crew

Next step

Get a delivery date

Tell us the address, the dates and the headcount. We size the order and confirm the route.